Capacitated Lot Sizing Problems in Process Industries /

Saved in:
Bibliographic Details
Author / Creator:Ramya, Ravi.
Edition:1st ed. 2019.
Imprint:Cham : Springer International Publishing : Imprint: Springer, 2019.
Description:1 online resource (XXXV, 196 p. 41 illus. :) online resource.
Language:English
Subject:
Format: E-Resource Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/12574243
Hidden Bibliographic Details
Other authors / contributors:Rajendran, Chandrasekharan.
Ziegler, Hans.
Mohapatra, Sanjay.
Ganesh, K.
ISBN:9783030012229
3030012220
9783030012212
3030012212
9783030012236
3030012239
Digital file characteristics:text file PDF
Summary:This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.
Other form:Printed edition: 9783030012212
Printed edition: 9783030012236
Standard no.:10.1007/978-3-030-01222-9

MARC

LEADER 00000cam a2200000Mi 4500
001 12574243
005 20210625185032.1
006 m d
007 cr n |||
008 190104s2019 gw o ||| 0 eng d
020 |a 9783030012229 
020 |a 3030012220 
020 |a 9783030012212  |q (print) 
020 |a 3030012212 
020 |a 9783030012236  |q (print) 
020 |a 3030012239 
024 7 |a 10.1007/978-3-030-01222-9  |2 doi 
035 |a (OCoLC)1162681038 
035 9 |a (OCLCCM-CC)1162681038 
040 |a VT2  |b eng  |c VT2  |d OCLCF  |d OCLCO  |d ERF 
049 |a MAIN 
050 4 |a TS155-TS194 
072 7 |a KJMV5  |2 bicssc 
072 7 |a BUS087000  |2 bisacsh 
072 7 |a KJMV5  |2 thema 
100 1 |a Ramya, Ravi. 
245 1 0 |a Capacitated Lot Sizing Problems in Process Industries /  |c by Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra, K. Ganesh. 
250 |a 1st ed. 2019. 
260 |a Cham :  |b Springer International Publishing :  |b Imprint: Springer,  |c 2019. 
300 |a 1 online resource (XXXV, 196 p. 41 illus. :)  |b online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a text file  |b PDF  |2 rda 
505 0 |a Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments. 
520 |a This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries. 
650 0 |a Production management.  |0 http://id.loc.gov/authorities/subjects/sh85107216 
650 0 |a Industrial engineering.  |0 http://id.loc.gov/authorities/subjects/sh85065864 
650 0 |a Production engineering.  |0 http://id.loc.gov/authorities/subjects/sh85107212 
650 0 |a Operations research.  |0 http://id.loc.gov/authorities/subjects/sh85095020 
650 0 |a Decision making.  |0 http://id.loc.gov/authorities/subjects/sh85036199 
650 7 |a Decision making.  |2 fast  |0 (OCoLC)fst00889035 
650 7 |a Industrial engineering.  |2 fast  |0 (OCoLC)fst00970992 
650 7 |a Operations research.  |2 fast  |0 (OCoLC)fst01046387 
650 7 |a Production engineering.  |2 fast  |0 (OCoLC)fst01078282 
650 7 |a Production management.  |2 fast  |0 (OCoLC)fst01078309 
700 1 |a Rajendran, Chandrasekharan. 
700 1 |a Ziegler, Hans. 
700 1 |a Mohapatra, Sanjay. 
700 1 |a Ganesh, K. 
776 0 8 |i Printed edition:  |z 9783030012212 
776 0 8 |i Printed edition:  |z 9783030012236 
903 |a HeVa 
929 |a oclccm 
999 f f |i 5bcf55e6-a20b-5c32-8964-94197dfb6619  |s e83e3dbf-89f4-5d73-8a68-6b24aea83345 
928 |t Library of Congress classification  |a TS155-TS194  |l Online  |c UC-FullText  |u https://link.springer.com/10.1007/978-3-030-01222-9  |z Springer Nature  |g ebooks  |i 12528782