BWR post-scram drywell pressurization.
Saved in:
Imprint: | Washington, D.C. : United States Nuclear Regulatory Commission, Office of Inspection and Enforcement, 1984. |
---|---|
Description: | 1 online resource. |
Language: | English |
Series: | Information notice ; 84-35 Information notice ; no. 84-35. |
Subject: | |
Format: | E-Resource U.S. Federal Government Document Book |
URL for this record: | http://pi.lib.uchicago.edu/1001/cat/bib/12671323 |
Varying Form of Title: | Boiling water reactor post-scram drywell pressurization |
---|---|
Other authors / contributors: | U.S. Nuclear Regulatory Commission. Office of Inspection and Enforcement, issuing body. |
Notes: | "April 23, 1984." Description based on online resource; title from HTML title screen (NRC, viewed Oct. 26, 2020). |
GPO item no.: | 1051-H-08 (online) |
Govt.docs classification: | Y 3.N 88:56-2/84-35 |
Similar Items
-
Technical report on operating experience with BWR pressure relief systems.
Published: (1978) -
EBWR reactor pressure vessel revisions for instrumentation and increased steam output /
by: Kettles, T. L.
Published: (1962) -
Resolution of Generic Issue C-8 : an evaluation of boiling water reactor main stream isolation valve leakage and the effectiveness of leakage treatment methods /
by: Ridgely, J. N.
Published: (1986) -
Generic safety evaluation report regarding integrity of BWR scram system piping.
Published: (1981) -
Failure of steam dryer cover plate after a recent power uprate.
Published: (2002)