A working guide to process equipment : how process equipment works /

Saved in:
Bibliographic Details
Author / Creator:Lieberman, Norman P.
Imprint:New York : McGraw-Hill, c1997.
Description:xvii, 425 p.
Language:English
Subject:
Format: Print Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/2555236
Hidden Bibliographic Details
Other authors / contributors:Lieberman, Elizabeth T.
ISBN:0070380759
Notes:Includes bibliographical references and index.
committed to retain 20170930 20421213 HathiTrust

MARC

LEADER 00000cam a2200000 a 4500
001 2555236
003 ICU
005 20030522185400.0
008 970107s1997 nyu 001 0 eng u
010 |a  96030959  
020 |a 0070380759 
035 |a (ICU)BID22717804 
040 |a DLC  |c DLC  |d OrLoB-B  |d OCoLC 
041 0 |a eng 
050 0 0 |a TP157  |b .L475 1997 
082 0 0 |a 660/.283  |2 20 
100 1 |a Lieberman, Norman P.  |0 http://id.loc.gov/authorities/names/n80160663  |1 http://viaf.org/viaf/103113610 
245 1 2 |a A working guide to process equipment :  |b how process equipment works /  |c Norman P. Lieberman, Elizabeth T. Lieberman. 
260 |a New York :  |b McGraw-Hill,  |c c1997. 
263 |a 9611 
300 |a xvii, 425 p. 
336 |a text  |b txt  |2 rdacontent  |0 http://id.loc.gov/vocabulary/contentTypes/txt 
337 |a unmediated  |b n  |2 rdamedia  |0 http://id.loc.gov/vocabulary/mediaTypes/n 
338 |a volume  |b nc  |2 rdacarrier  |0 http://id.loc.gov/vocabulary/carriers/nc 
504 |a Includes bibliographical references and index. 
505 0 0 |g Ch. 1.  |t How Trays Work: Flooding: Downcomer Backup --  |g Ch. 2.  |t How Trays Work: Dumping: Weeping Through Tray Decks --  |g Ch. 3.  |t Why Control Tower Pressure: Options for Optimizing Tower Operating Pressure --  |g Ch. 4.  |t What Drives Distillation Towers: Reboiler Function --  |g Ch. 5.  |t How Reboilers Work: Thermosyphon, Gravity Feed, and Forced --  |g Ch. 6.  |t How Instruments Work: Levels, Pressures, Flows, and Temperatures --  |g Ch. 7.  |t Packed Towers: Better than Trays? Packed-Bed Vapor and Liquid Distribution --  |g Ch. 8.  |t Steam and Condensate Systems: Water Hammer and Condensate Backup Steam-Side Reboiler Control --  |g Ch. 9.  |t Bubble Point and Dew Point: Equilibrium Concepts in Vapor-Liquid Mixtures --  |g Ch. 10.  |t Steam Strippers: Source of Latent Heat of Vaporization --  |g Ch. 11.  |t Draw-off Nozzle Hydraulics: Nozzle Cavitation Due to Lack of Hydrostatic Head --  |g Ch. 12.  |t Pumparounds and Tower Heat Flows: Closing the Tower Enthalpy Balance --  |g Ch. 13.  |t Condensers and Tower Pressure Control: Hot-Vapor Bypass: Flooded Condenser Control --  |g Ch. 14.  |t Air Coolers: Fin-Fan Coolers --  |g Ch. 15.  |t Deaerators and Steam Systems: Generating Steam in Boilers and BFW Preparation --  |g Ch. 16.  |t Vacuum Systems: Steam Jet Ejectors: Steam Jet Ejectors --  |g Ch. 17.  |t Steam Turbines: Use of Horsepower Valves and Correct Speed Control --  |g Ch. 18.  |t Surface Condensers: The Condensing Steam Turbine --  |g Ch. 19.  |t Shell-and-Tube Heat Exchangers: Heat-Transfer Fouling Resistance --  |g Ch. 20.  |t Fired Heaters: Fire- and Flue-Gas-Side: Draft and Afterburn; Optimizing Excess Air --  |g Ch. 21.  |t Fired Heaters: Process Side: Coking Furnace Tubes and Tube Failures --  |g Ch. 22.  |t Refrigeration Systems: An Introduction to Centrifugal Compressors --  |g Ch. 23.  |t Centrifugal Pumps: Fundamentals of Operation: Head, Flow, and Pressure --  |g Ch. 24.  |t Centrifugal Pumps: Driver Limits: Motors, Steam Turbines, and Gears --  |g Ch. 25.  |t Centrifugal Pumps: Suction Pressure Limits: Cavitation and Net Positive Suction Head --  |g Ch. 26.  |t Separators: Vapor-Hydrocarbon-Water: Liquid Settling Rates --  |g Ch. 27.  |t Gas Compression: The Basic Idea: The Second Law of Thermodynamics Made Easy --  |g Ch. 28.  |t Centrifugal Compressors and Surge: Overamping the Motor Driver --  |g Ch. 29.  |t Reciprocating Compressors: Positive Displacement and Carnot Cycle; Use of Indicator Card --  |g Ch. 30.  |t Compressor Efficiency --  |g Ch. 31.  |t Safety Equipment: Relief Valves, Corrosion, and Trips --  |t The Norm Lieberman Video Library of Troubleshooting Process Operations. 
583 1 |a committed to retain  |c 20170930  |d 20421213  |f HathiTrust  |5 ICU 
650 0 |a Chemical plants  |x Equipment and supplies.  |0 http://id.loc.gov/authorities/subjects/sh85022934 
650 7 |a Chemical plants  |x Equipment and supplies.  |2 fast  |0 http://id.worldcat.org/fast/fst00853101 
700 1 |a Lieberman, Elizabeth T.  |0 http://id.loc.gov/authorities/names/n96077040  |1 http://viaf.org/viaf/21408159 
901 |a ToCBNA 
903 |a HeVa 
903 |a Hathi 
035 |a (OCoLC)35235958 
929 |a cat 
999 f f |i 235a8891-c5a6-50a6-9f75-e19c35c15508  |s 5c83246e-58f5-5f2f-b14a-d537b94676d0 
928 |t Library of Congress classification  |a TP157.L4750 1997  |l ASR  |c ASR-SciASR  |i 3460466 
927 |t Library of Congress classification  |a TP157.L4750 1997  |l ASR  |c ASR-SciASR  |e CRERAR  |b 44657430  |i 4735566