Defense acquisitions : progress in meeting F-22 cost and schedule goals : statement for the record by Louis J. Rodrigues, Director, Defense Acquisitions Issues, National Security and International Affairs Division, before the Committee on Government Reform, Subcommittee on National Security, Veterans Affairs, and International Relations, House of Representatives /

Saved in:
Bibliographic Details
Author / Creator:Rodrigues, Louis J.
Imprint:Washington, D.C. (P.O. Box 37050, Washington 20013) : The Office, [1999]
Description:8 pages ; 28 cm.
Language:English
Series:Testimony ; GAO/T-NSIAD-00-58
Testimony ; GAO/T-NSIAD-00-58.
Subject:
Format: E-Resource Microform U.S. Federal Government Document Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/6518152
Hidden Bibliographic Details
Varying Form of Title:Progress in meeting F-22 cost and schedule goals
Other authors / contributors:United States. General Accounting Office.
Notes:"December 7, 1999."
Includes bibliographical references (page 8).
Available via Internet from the GPO Access web site. Address as of 10/19/01: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=gao&docid=f:ns00058t.pdf; current access is available via PURL.
GPO item no.:0546-D-01 (MF)
0546-D-01 (online)
Govt.docs classification:GA 1.5/2:T-NSIAD-00-58

MARC

LEADER 00000cam a2200000 a 4500
001 6518152
005 20050706160841.0
006 m d f
007 cr anu||||||||
008 000519s1999 dcu ob f000 0 eng c
003 ICU
035 |a (OCoLC)44087027 
037 |a 163073  |b GAO (202) 512-6000 (voice); (301) 258-4066 (Fax)  |f paper copy 
042 |a pcc 
043 |a n-us--- 
040 |a GPO  |b eng  |c GPO  |d MvI 
074 |a 0546-D-01 (MF) 
074 |a 0546-D-01 (online) 
086 0 |a GA 1.5/2:T-NSIAD-00-58 
100 1 |a Rodrigues, Louis J.  |0 http://id.loc.gov/authorities/names/no89010320  |1 http://viaf.org/viaf/93351732 
245 1 0 |a Defense acquisitions :  |b progress in meeting F-22 cost and schedule goals : statement for the record by Louis J. Rodrigues, Director, Defense Acquisitions Issues, National Security and International Affairs Division, before the Committee on Government Reform, Subcommittee on National Security, Veterans Affairs, and International Relations, House of Representatives /  |c United States General Accounting Office. 
246 3 0 |a Progress in meeting F-22 cost and schedule goals 
264 1 |a Washington, D.C. (P.O. Box 37050, Washington 20013) :  |b The Office,  |c [1999] 
300 |a 8 pages ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent  |0 http://id.loc.gov/vocabulary/contentTypes/txt 
337 |a microform  |b h  |2 rdamedia  |0 http://id.loc.gov/vocabulary/mediaTypes/h 
338 |a microfiche  |b he  |2 rdacarrier  |0 http://id.loc.gov/vocabulary/carriers/he 
490 1 |a Testimony ;  |v GAO/T-NSIAD-00-58 
500 |a "December 7, 1999." 
504 |a Includes bibliographical references (page 8). 
538 |a Available via Internet from the GPO Access web site. Address as of 10/19/01: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=gao&docid=f:ns00058t.pdf; current access is available via PURL. 
610 1 0 |a United States.  |b Air Force  |x Management. 
650 0 |a F-22 (Jet fighter plane)  |x Design and construction  |x Costs. 
650 0 |a F-22 (Jet fighter plane)  |x Testing. 
710 1 |a United States.  |b General Accounting Office.  |0 http://id.loc.gov/authorities/names/n80126064  |1 http://viaf.org/viaf/144983863 
830 0 |a Testimony ;  |v GAO/T-NSIAD-00-58. 
856 4 0 |u https://purl.fdlp.gov/GPO/LPS15268  |y Government Publishing Office 
903 |a HeVa 
903 |a HeVa 
929 |a eresource 
999 f f |i 42b8da80-812f-5732-be26-95f2c50a224d  |s 58d3a399-e566-53e7-a8de-93f3b2a6d5ad 
928 |t Library of Congress classification  |l Online  |c UC-FullText  |u https://purl.fdlp.gov/GPO/LPS15268  |z Government Publishing Office  |g ebooks  |i 12313852