Advanced unit commitment strategies in the United States eastern interconnection /

Saved in:
Bibliographic Details
Imprint:Golden, Colo. : National Renewable Energy Laboratory, [2011]
Description:1 online resource (vi, 62 p.) : col. ill., col. map.
Language:English
Series:NREL/SR ; 5500-49988
NREL/SR ; 5500-49988.
Subject:
Format: E-Resource U.S. Federal Government Document Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/8535090
Hidden Bibliographic Details
Other authors / contributors:Meibom, Peter.
National Renewable Energy Laboratory (U.S.)
Notes:Title from title screen (viewed September 12, 2011).
"August 2011."
AFW-0-99426-01. DE-AC36-08GO28308
Summary:This project sought to evaluate the impacts of high wind penetrations on the U.S. Eastern Interconnection and analyze how different unit commitment strategies may affect these impacts. In January 2010, the Eastern Wind Integration and Transmission Study (EWITS) was published. The study evaluated the operating impacts for 20% and 30% wind power on the majority of the Eastern Interconnection. It also evaluated different scenarios of where the wind was located as well as different transmission plans. This follow-up study was intended to further the analysis performed in EWITS by focusing on the impacts of advanced unit commitment strategies used at high penetrations of wind power. It will point to both the effect that various assumptions about modeling unit commitment will have on integration studies, as well as the effect that the strategies will have on actual system operation with high wind power.
GPO item no.:0430-P-05 (online)
Govt.docs classification:E 9.18:NREL/SR-5500-49988
Description
Item Description:Title from title screen (viewed September 12, 2011).
"August 2011."
Physical Description:1 online resource (vi, 62 p.) : col. ill., col. map.