|
|
|
|
LEADER |
00000nam a2200000Ia 4500 |
001 |
8848551 |
003 |
ICU |
005 |
20120713123500.0 |
006 |
m | d f |
007 |
cr mn||||||||| |
008 |
120619s2011 vaua sb f000 0 eng c |
035 |
|
|
|a (OCoLC)795831429
|
040 |
|
|
|a GPO
|c GPO
|d MvI
|
043 |
|
|
|a n-us---
|
074 |
|
|
|a 0982-G-91 (online)
|
086 |
0 |
|
|a TD 2.30/26:12-013
|
100 |
1 |
|
|a Culmo, Michael P.
|
245 |
1 |
0 |
|a Accelerated bridge construction :
|b experience in design, fabrication and erection of prefabricated bridge elements and systems : final manual /
|c [Michael P. Culmo].
|
246 |
3 |
|
|a Experience in design, fabrication and erection of prefabricated bridge elements and systems
|
246 |
3 |
|
|a Accelerated bridge construction manual
|
260 |
|
|
|a McLean, VA :
|b U.S. Dept. of Transportation, Federal Highway Administration,
|c [2011]
|
300 |
|
|
|a 1 online resource (347 p.) :
|b col. ill.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|0 http://id.loc.gov/vocabulary/contentTypes/txt
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|0 http://id.loc.gov/vocabulary/mediaTypes/c
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|0 http://id.loc.gov/vocabulary/carriers/cr
|
500 |
|
|
|a "Publication Date: 11-01-11."
|
500 |
|
|
|a "HIF-12-013."
|
500 |
|
|
|a Title from title screen (viewed on June 19, 2012).
|
504 |
|
|
|a Includes bibliographical references (p. 271-275).
|
505 |
2 |
|
|a Introduction WHY ABC? -- Accelerated bridge construction technologies -- PBES for ABC: Planning and scoping projects -- Implementing ABC in a transportation agency (A case study from the Utah DOT) -- Prefabricated bridge elements -- Miscellaneous bridge elements -- Construction -- Long term performance of prefabricated elements -- Design and analysis -- References -- Appendices.
|
536 |
|
|
|a Performing organizations: CME Associates, Inc. and Applied Research Associates, Inc.; sponsored by the Office of Bridge Technology
|
650 |
|
0 |
|a Prefabricated bridges
|0 http://id.loc.gov/authorities/subjects/sh85016884
|
650 |
|
0 |
|a Bridges
|z United States
|x Design and construction.
|
650 |
|
7 |
|a Bridges
|x Design and construction.
|2 fast
|0 http://id.worldcat.org/fast/fst00838690
|
650 |
|
7 |
|a Prefabricated bridges.
|2 fast
|0 http://id.worldcat.org/fast/fst01715675
|
651 |
|
7 |
|a United States.
|2 fast
|0 http://id.worldcat.org/fast/fst01204155
|
710 |
1 |
|
|a United States.
|b Federal Highway Administration.
|b Office of Bridge Technology.
|0 http://id.loc.gov/authorities/names/no2001032565
|1 http://viaf.org/viaf/136369435
|
710 |
2 |
|
|a CME Associates.
|0 http://id.loc.gov/authorities/names/n85246372
|1 http://viaf.org/viaf/130256131
|
710 |
2 |
|
|a Applied Research Associates.
|0 http://id.loc.gov/authorities/names/no2002113249
|1 http://viaf.org/viaf/141813638
|
776 |
0 |
8 |
|i Print version:
|a Culmo, Michael P.
|t Accelerated bridge construction
|w (OCoLC)782136705
|
856 |
4 |
0 |
|u http://purl.fdlp.gov/GPO/gpo21928
|
903 |
|
|
|a HeVa
|
929 |
|
|
|a eresource
|
999 |
f |
f |
|i a85aa7c7-6c65-5d17-b2c3-98cb369d2af8
|s 939b62b8-ada1-57ba-9210-25708288d18b
|
928 |
|
|
|l Online
|c UC-FullText
|u http://purl.fdlp.gov/GPO/gpo21928
|g ebooks
|i 7506793
|