Potential problem with main steamline break analysis for main steam vaults/tunnels.
Saved in:
Imprint: | Washington, D.C. : United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, [1993] |
---|---|
Description: | 1 online resource. |
Language: | English |
Series: | NRC information notice ; 93-55 NRC information notice ; 93-55. |
Subject: | |
Format: | E-Resource U.S. Federal Government Document Book |
URL for this record: | http://pi.lib.uchicago.edu/1001/cat/bib/8963885 |
Other authors / contributors: | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. |
---|---|
Notes: | Title from title screen (viewed Jan. 9, 2013). "July 21, 1993." |
GPO item no.: | 1051-H-08 (online) |
Govt.docs classification: | Y 3.N 88:56-2/93-55 |
Similar Items
-
Operational experience on steam generator tube leaks and tube ruptures.
Published: (1994) -
Common mode failure of main steam isolation nonreturn check valves.
Published: (1983) -
Inservice inspection deficiencies result in severely degraded steam generator tubes.
Published: (1994) -
inadequate main steam safety valve (MSSV) setpoints and performance issues associated with long MSSV inlet piping.
Published: (1997) -
Locking devices inadequately installed on main steam isolation valves.
Published: (1981)